MUNICIPAL PROJECT
Shield is providing the Town of Flower Mound with civil engineering design and survey services for an approximately 10.8-acre park. The town’s vision is to create a park that will seamlessly connect to Canyon Falls Village subdivision’s extensive trail system.
The approved master plan for the park includes an ADA accessible 8-ft trail system, scenic overlook, pavilion, basketball court, two playgrounds, a 2,200SF splash pad, fitness area and a parking lot.
Currently in construction, this project is set to be completed in 2023.
- Location: Flower Mound, TX
- Project Dates: 2017 – Present
- Client: The Town of Flower Mound
- Size: Approximately 10.8 Acres
- Services Included: Water, Sewer, Paving, Grading, Drainage & Survey
ABOUT
Located in North Texas, Shield offers full engineering and production capabilities, including preparation of plans, specifications and cost estimates.
SERVICES
- Land Development
- Land Surveying
- Water Resources Engineering
- Municipal Infrastructure
- Geographic Information Systems
CONTACT
Forth Worth Location:
1600 West 7th Street
Suite 400
Fort Worth, TX 76102
Dallas Location:
17311 North Dallas Parkway
Suite 210
Dallas, TX 75248
817.810.0696
[email protected]
TBPE FIRM #F-11039
TBPLS FIRM #10193890